The aging of the annual media collection systems should be replaced in steps during the current operation room by room.
The new panel should be adapted to existing systems to avoid additional works.
Used technology
-
18 dialysis places Phoenix Media Center, built in disguise pretext
-
Integration of new media supply systems in the existing permeate and concentrate lines
-
Connection of the new systems to the existing electrical installation and required electrical inspections
Through the flexible adaptation of the Phoenix Media Center additional structural work could be reduced to a minimum of paintwork. The work was carried out during normal operation of dialysis and could be completed within 6 days.