Replacement of the existing water treatment and renovation of the permeate and the concentrate supply.
Use of the existing building stucture
The new dispense systems was integrated in the existing niches. Because of the flexible concept of the Phoenix media supply systems a adaption at the constructional conditions was possible without any trouble. Additional contract works were avoided.
Construction time only 3,5 days!
Phoenix Pure Water is working together with cooperating companys in project-related insets. Therefore the construction time could be reduced on a minimum. The whole reconstruction could be realized in not even four days.