The water technology at the existing dialysis centre Mühlhausen at the Blobach had to be changed completely.
Furthermore it was planned to enlarge the dialysis centre with 12 dialysis places and a technician double place.
The existing building structure had to be considered. Due to the operating dialysis the reconstruction was supposed to be implemented in several stages.
Used technology
-
Reverse osmosis Phoenix One 1600l/h, project-realted pre-filtration and softening.
-
Dead zone-free permeate ring line made with PVDF, bead and crevice free welded (BCF®)
-
Phoenix Media centre, integrated in a provided on site wall covering.
Because of the flexible technology of the Phoenix Media centre the requested special equipment in the field of concentrate supply could be realized without any ploblems.