The existing water treatment- and media-supply systems of the dialysis centre Hattingen had to be replaced during the dialysis operations.
The renovation was done in according to a detailled time- an work scedule in
only 4 days. All old media supply systems were replaced with the Phoenix MOVE system. The water treatment including the prefiltration was replaced. The ring line for permeate and concentrate was newly installed.
Because of our special procedure for renovations of dialysis centres
Renovation & replacement
all operations were done without provisional ring lines and without affecting the dialysis operations. The duration of the renovation took only 4 days and there was nearly no inconvenience for the patients and the personal.